Headwall Installation
Althon have recently supplied 2No. SFA27D Headwalls with bolt on toes to suit 1200mm dia concrete pipes to Upton upon Severn Marina.
All of our SFA headwalls and toes are cast with lifting points for easy and quick offloading, transporting and installing into their final position. No need for any specialised lifting equipment just standard lifting hooks are chains are need to move the headwalls and toes.
You can use our Headwall Specifier to find the headwall you require. We can then assist with pricing and design drawings detailing an appropriate headwall
You can also visit the Precast Headwalls section of our website