Eel Pass Headwall
Althon have designed and produced a special eel pass precast concrete headwall for an environmentally sensitive scheme.
We produced two headwalls and delivered them to the Contractor in just three weeks. The headwalls were lifted off the delivery vehicle and immediately installed.